Default SCADA Page         AKELCO Power Log         GENSET Log         Scada Detailed Log                                                      Refresh Akelco Stats To-Date
AKELCO AKELCO Switched GENSET ATS   Booster Rain
 
AKELCO Annual Performance Statistics
as measured on AKELCO Route 1317 at Brgy Dalipdip, Altavas, AKL
2020
(0/0) 126
11,491
191.52
1.52
69.52
2.90
97.81
2021
(27/154) 181
12,857
214.28
1.18
48.40
2.02
97.55
2022
(20/217) 237
19,946
332.43
1.40
36.96
1.54
96.21
2023
(33/151) 184
18,660
311.00
1.69
47.61
1.98
96.45
2024
(2/26) 28
4,884
81.40
2.91
101.14
4.21
97.13
Parameter
(PFS/PFU) PF
PF (minutes)
PF (hours)
MTTR (hours)
MTBF (hours)
MTBF (days)
% Availability

AKELCO Power Failure Log
Dalipdip Tuktok

2020 * 2021 * 2022 * 2023

List refreshed at 2024-05-05 @ 09:28:46 PHST
Event #Time OffTime On Outage d h:m:sIndexTypeNotes
12023-12-30 @ 22:33:232023-12-30 @ 22:57:4500:24:223093PFUUnscheduled Outage.
22023-12-29 @ 18:27:572023-12-29 @ 18:50:4700:22:503085PFUUnscheduled Outage.
32023-12-25 @ 20:38:062023-12-25 @ 20:53:1600:15:103077PFUUnscheduled Outage. NGCP.
42023-12-25 @ 19:11:472023-12-25 @ 19:31:2500:19:383069PFUUnscheduled Outage. NGCP.
52023-12-22 @ 00:28:102023-12-22 @ 00:42:1200:14:023060PFUUnscheduled Outage.
62023-12-20 @ 09:28:372023-12-20 @ 09:38:2000:09:433052PFUUnscheduled Outage. NGCP.
72023-12-18 @ 04:53:512023-12-18 @ 05:07:4100:13:503044PFUUnscheduled Outage.
82023-12-11 @ 01:45:312023-12-11 @ 02:29:2800:43:573036PFUUnscheduled Outage.
92023-12-10 @ 04:13:472023-12-10 @ 06:53:0702:39:203028PFUUnscheduled Outage.
102023-12-08 @ 08:50:082023-12-08 @ 09:25:4000:35:323020PFUUnscheduled Outage. NGCP.
112023-11-27 @ 18:55:152023-11-27 @ 19:10:2100:15:063012PFUUnscheduled Outage.
122023-11-27 @ 18:32:322023-11-27 @ 18:32:3300:00:013008PFUUnscheduled Outage.
132023-11-27 @ 17:51:042023-11-27 @ 17:51:0500:00:013004PFUUnscheduled Outage
142023-11-26 @ 02:32:582023-11-26 @ 02:42:2900:09:312996PFUUnscheduled Outage. NGCP 69kV.
152023-11-20 @ 07:54:542023-11-20 @ 15:02:2507:07:312974PFUUnscheduled Outage. AKELCO removed power due to flooding and rain damage. 8"+ over 24 hrs.
162023-11-17 @ 11:09:322023-11-17 @ 11:09:4800:00:162964PFUUnscheduled Outage.
172023-11-17 @ 10:58:262023-11-17 @ 11:06:0300:07:372956PFUUnscheduled Outage.
182023-11-17 @ 06:09:572023-11-17 @ 07:27:0101:17:042948PFSScheduled Outage. NGCP. New 20MVA Transformer commissioning.
192023-11-16 @ 08:30:562023-11-16 @ 17:27:2808:56:322940PFSScheduled Outage. Pole replacement for road widening.
202023-11-15 @ 21:56:392023-11-15 @ 22:26:1500:29:362932PFUUnscheduled Outage.
212023-11-14 @ 08:41:302023-11-14 @ 17:40:3408:59:042925PFUUnscheduled Outage.
222023-11-13 @ 22:50:102023-11-13 @ 23:09:5900:19:492917PFUUnscheduled Outage. NGCP.
232023-11-12 @ 08:17:362023-11-12 @ 17:04:2708:46:512910PFSScheduled Outage. Pole replacement for road widening.
242023-11-12 @ 01:27:262023-11-12 @ 03:10:5901:43:332901PFUUnscheduled Outage.
252023-11-11 @ 16:33:322023-11-11 @ 16:44:4400:11:122893PFUUnscheduled Outage.
262023-11-11 @ 16:26:552023-11-11 @ 16:26:5500:00:002890PFUUnscheduled Outage.
272023-11-11 @ 08:56:332023-11-11 @ 16:23:2007:26:472882PFSScheduled Outage. Pole replacement for road widening.
282023-11-10 @ 08:21:292023-11-10 @ 17:32:4609:11:172872PFSScheduled Outage. Pole replacement for road widening.
292023-11-09 @ 09:21:182023-11-09 @ 17:24:3508:03:172864PFSScheduled Outage. Pole replacement for road widening.
302023-11-08 @ 07:43:162023-11-08 @ 17:37:2509:54:092856PFSScheduled Outage. Pole replacement for road widening.
312023-11-07 @ 00:07:422023-11-07 @ 00:51:2900:43:472848PFUUnscheduled Outage.
322023-11-06 @ 08:27:092023-11-06 @ 17:34:1809:07:092840PFSScheduled Outage. Pole replacement for road widening.
332023-10-28 @ 20:47:342023-10-28 @ 21:02:0300:14:292832PFUUnscheduled Outage. NGCP. Possibly storm-related.
342023-10-23 @ 03:09:432023-10-23 @ 03:54:4900:45:062814PFUUnscheduled Outage. NGCP.
352023-10-21 @ 09:16:422023-10-21 @ 17:14:3007:57:482664PFSScheduled Outage. Pole replacement for road widening.
362023-10-20 @ 20:50:112023-10-20 @ 20:52:2700:02:162658PFUUnscheduled Outage.
372023-10-20 @ 18:58:102023-10-20 @ 19:28:0000:29:502650PFUUnscheduled Outage.
382023-10-19 @ 09:07:312023-10-19 @ 16:10:4107:03:102641PFSScheduled Outage. Pole replacement for road widening.
392023-10-12 @ 23:43:492023-10-13 @ 00:44:5101:01:022630PFUUnscheduled Outage.
402023-10-08 @ 18:18:482023-10-08 @ 19:09:0300:50:152622PFUUnscheduled Outage.
412023-10-06 @ 18:53:392023-10-06 @ 19:24:1300:30:342604PFUUnscheduled Outage.
422023-10-06 @ 14:10:122023-10-06 @ 14:59:2800:49:162597PFUUnscheduled Outage.
432023-09-30 @ 08:09:492023-09-30 @ 09:59:3901:49:502588PFSScheduled Outage. NGCP.
442023-09-26 @ 11:20:202023-09-26 @ 11:36:0200:15:422580PFUUnscheduled Outage. NGCP.
452023-09-22 @ 12:38:422023-09-22 @ 16:01:0003:22:182575PFUUnscheduled Outage.
462023-09-22 @ 01:42:172023-09-22 @ 05:57:0704:14:502567PFUUnscheduled Outage.
472023-09-16 @ 20:06:012023-09-16 @ 20:10:4200:04:412562PFUUnscheduled Outage.
482023-09-16 @ 19:50:152023-09-16 @ 20:06:0000:15:452557PFUUnscheduled Outage.
492023-09-16 @ 17:17:302023-09-16 @ 17:30:2600:12:562549PFSScheduled Outage.
502023-09-16 @ 05:45:482023-09-16 @ 05:53:5300:08:052541PFSScheduled Outage.
512023-09-12 @ 16:58:232023-09-12 @ 17:19:1500:20:522534PFUUnscheduled Outage.
522023-09-12 @ 14:48:272023-09-12 @ 16:58:2002:09:532527PFUUnscheduled Outage.
532023-09-10 @ 01:20:132023-09-10 @ 01:42:0100:21:482519PFUUnscheduled Outage. NGCP.
542023-09-07 @ 03:08:132023-09-07 @ 03:24:5100:16:382511PFUUnscheduled Outage. NGCP.
552023-09-01 @ 08:15:222023-09-01 @ 16:40:1308:24:512503PFSScheduled Outage.
562023-08-28 @ 03:47:072023-08-28 @ 04:16:1300:29:062495PFUUnscheduled Outage.
572023-08-25 @ 01:26:082023-08-25 @ 01:26:0800:00:002491PFUUnscheduled Outage.
582023-08-25 @ 00:33:022023-08-25 @ 00:53:5300:20:512484PFUUnscheduled Outage.
592023-08-23 @ 04:42:592023-08-23 @ 04:43:0000:00:012479PFUUnscheduled Outage.
602023-08-20 @ 16:42:002023-08-20 @ 17:12:2700:30:272470PFSScheduled Outage.
612023-08-20 @ 06:11:052023-08-20 @ 06:50:5800:39:532462PFSScheduled Outage.
622023-08-17 @ 01:17:322023-08-17 @ 02:03:5600:46:242455PFUUnscheduled Outage.
632023-08-17 @ 01:17:302023-08-17 @ 01:17:3000:00:002452PFUUnscheduled Outage.
642023-08-17 @ 01:17:042023-08-17 @ 01:17:2800:00:242449PFUUnscheduled Outage.
652023-08-17 @ 00:50:082023-08-17 @ 01:17:0400:26:562444PFUUnscheduled Outage.
662023-08-12 @ 04:12:222023-08-12 @ 04:39:3500:27:132436PFUUnscheduled Outage.
672023-08-07 @ 09:46:482023-08-07 @ 15:03:2205:16:342424PFSScheduled Outage. Altavas SS 10 MVA
682023-08-05 @ 08:04:262023-08-05 @ 14:44:5906:40:332416PFSScheduled Outage. Altavas SS 10 MVA.
692023-08-05 @ 02:29:482023-08-05 @ 02:42:3000:12:422408PFUUnscheduled Outage.
702023-08-03 @ 12:31:452023-08-03 @ 12:31:4700:00:022403PFUUnscheduled Outage.
712023-08-02 @ 12:32:452023-08-02 @ 12:52:5300:20:082396PFUUnscheduled Outage. NGCP.
722023-07-29 @ 03:56:062023-07-29 @ 04:08:5400:12:482387PFUUnscheduled Outage. NGCP.
732023-07-27 @ 06:48:302023-07-27 @ 07:03:3300:15:032380PFUUnscheduled Outage.
742023-07-27 @ 04:20:412023-07-27 @ 04:33:2600:12:452371PFUUnscheduled Outage.
752023-07-27 @ 01:58:582023-07-27 @ 02:15:0900:16:112364PFUUnscheduled Outage.
762023-07-27 @ 01:58:572023-07-27 @ 01:58:5700:00:002362PFUUnscheduled Outage.
772023-07-26 @ 16:14:562023-07-26 @ 16:23:4800:08:522354PFUUnscheduled Outage.
782023-07-25 @ 15:14:592023-07-25 @ 16:38:5601:23:572350PFUUnscheduled Outage.
792023-07-25 @ 15:04:112023-07-25 @ 15:04:1200:00:012344PFUUnscheduled Outage.
802023-07-25 @ 14:31:392023-07-25 @ 14:53:4300:22:042337PFUUnscheduled Outage.
812023-07-25 @ 14:14:162023-07-25 @ 14:14:1700:00:012332PFUUnscheduled Outage.
822023-07-25 @ 14:14:132023-07-25 @ 14:14:1400:00:012328PFUUnscheduled Outage.
832023-07-25 @ 12:17:412023-07-25 @ 12:28:4500:11:042320PFUUnscheduled Outage. NGCP.
842023-07-25 @ 11:44:562023-07-25 @ 12:00:5200:15:562312PFUUnscheduled Outage. NGCP.
852023-07-25 @ 10:42:202023-07-25 @ 10:55:0900:12:492304PFUUnscheduled Outage. NGCP.
862023-07-25 @ 02:00:202023-07-25 @ 02:17:0600:16:462296PFUUnscheduled Outage. NGCP.
872023-07-24 @ 20:49:322023-07-24 @ 20:59:5100:10:192288PFUUnscheduled Outage.
882023-07-22 @ 19:48:012023-07-22 @ 20:02:1100:14:102280PFUUnscheduled Outage. NGCP Gecko intrusion.
892023-07-21 @ 08:41:412023-07-21 @ 08:48:3000:06:492272PFUUnscheduled Outage.
902023-07-20 @ 18:32:372023-07-20 @ 19:02:1500:29:382264PFUUnscheduled Outage.
912023-07-18 @ 18:36:102023-07-18 @ 19:33:4400:57:342256PFUUnscheduled Outage.
922023-07-18 @ 05:11:572023-07-18 @ 05:26:2000:14:232248PFSScheduled Outage. NGCP.
932023-07-17 @ 20:04:382023-07-17 @ 21:30:5101:26:132240PFUUnscheduled Outage.
942023-07-17 @ 19:38:002023-07-17 @ 19:47:2100:09:212232PFUUnscheduled Outage.
952023-07-17 @ 17:41:552023-07-17 @ 19:33:1701:51:222224PFUUnscheduled Outage.
962023-07-17 @ 14:37:302023-07-17 @ 17:26:5602:49:262216PFUUnscheduled Outage. NGCP Nabas 69kV.
972023-07-16 @ 13:34:542023-07-16 @ 13:57:0100:22:072208PFUUnscheduled Outage. NGCP 69kV.
982023-07-15 @ 17:19:372023-07-15 @ 17:32:0400:12:272201PFSScheduled Outage. Switch from Panit-an to Nabas.
992023-07-15 @ 05:41:542023-07-15 @ 06:46:2201:04:282193PFSScheduled Outage. Power transfer from Panit-an to Nabas.
1002023-07-13 @ 04:34:142023-07-13 @ 04:34:1500:00:012187PFUUnscheduled Outage.
1012023-07-11 @ 04:33:002023-07-11 @ 04:33:0100:00:012183PFUUnscheduled Outage.
1022023-07-09 @ 14:45:222023-07-09 @ 15:10:0400:24:422176PFSScheduled Outage
1032023-07-09 @ 08:06:372023-07-09 @ 10:09:0502:02:282167PFSScheduled Outage
1042023-07-08 @ 18:44:122023-07-08 @ 19:22:0900:37:572160PFUUnscheduled Outage.
1052023-07-03 @ 17:24:462023-07-03 @ 18:10:4100:45:552151PFUUnscheduled Outage.
1062023-07-02 @ 01:14:022023-07-02 @ 02:05:4500:51:432146PFUUnscheduled Outage.
1072023-07-01 @ 19:58:392023-07-01 @ 20:57:4600:59:072142PFUUnscheduled Outage.
1082023-07-01 @ 18:29:432023-07-01 @ 18:49:5400:20:112138PFUUnscheduled Outage.
1092023-07-01 @ 08:05:132023-07-01 @ 15:28:2507:23:122134PFSScheduled Outage. New 10 MVA transformer connected Altavas SS.
1102023-06-28 @ 12:09:222023-06-28 @ 13:02:5100:53:292129PFUUnscheduled Outage. Loose jumper terminal Altavas feeder C.
1112023-06-26 @ 19:05:202023-06-26 @ 19:28:2600:23:062124PFUUnscheduled Outage.
1122023-06-26 @ 09:36:092023-06-26 @ 09:44:2400:08:152120PFUUnscheduled Outage. NGCP.
1132023-06-22 @ 10:00:002023-06-22 @ 10:00:0100:00:012116PFUUnscheduled Outage. Specific Date/Time Indeterminate.
1142023-06-21 @ 10:00:002023-06-21 @ 10:00:0100:00:012112PFUUnscheduled Outage. Specific Date/Time Indeterminate.
1152023-06-20 @ 10:00:002023-06-20 @ 10:00:0100:00:012108PFUUnscheduled Outage. Specific Date/Time Indeterminate.
1162023-06-18 @ 16:00:002023-06-18 @ 17:25:0001:25:002104PFSScheduled Outage. NGCP 69kV load transfer activities.
1172023-06-17 @ 05:00:002023-06-17 @ 06:00:0001:00:002100PFSScheduled Outage. NGCP 69kV load transfer activities.
1182023-06-10 @ 13:28:002023-06-10 @ 18:21:0004:53:002093PFUUnscheduled Outage - Nearby Lightning Strike
1192023-06-10 @ 13:20:002023-06-10 @ 13:20:0000:00:002087PFUUnscheduled Outage - Nearby Lightning Strike
1202023-06-05 @ 16:27:232023-06-05 @ 16:54:4700:27:242080PFUUnscheduled Outage. 69kV NGCP fault.
1212023-05-30 @ 09:09:062023-05-30 @ 09:38:0700:29:012072PFUUnscheduled Outage. NGCP 69 kV
1222023-05-30 @ 01:18:512023-05-30 @ 01:33:0800:14:172064PFUUnscheduled Outage.
1232023-05-29 @ 08:47:132023-05-29 @ 09:27:2800:40:152056PFUUnscheduled Outage. Likely a lightning strike on NGCP 69kV line.
1242023-05-23 @ 04:26:472023-05-23 @ 06:05:1901:38:322048PFUUnscheduled Outage.
1252023-05-22 @ 04:19:432023-05-22 @ 05:26:5901:07:162040PFUUnscheduled Outage.
1262023-05-16 @ 15:24:182023-05-16 @ 17:09:3701:45:192032PFUUnscheduled Outage.
1272023-05-07 @ 09:28:312023-05-07 @ 10:14:2400:45:532024PFUUnscheduled Outage. AKELCO.
1282023-05-05 @ 02:49:562023-05-05 @ 08:57:3406:07:382016PFUUnscheduled Outage. NGCP.
1292023-05-05 @ 00:58:522023-05-05 @ 01:21:5500:23:032008PFUUnscheduled Outage. NGCP.
1302023-05-04 @ 08:25:272023-05-04 @ 08:38:1300:12:461995PFUUnscheduled Outage. NGCP.
1312023-05-03 @ 18:13:282023-05-03 @ 20:52:3002:39:021986PFUUnscheduled Outage. Probably storm-related.
1322023-05-03 @ 10:45:342023-05-03 @ 10:45:3500:00:011981PFUUnscheduled Outage.
1332023-05-02 @ 11:04:572023-05-02 @ 11:15:2900:10:321973PFUUnscheduled Outage. NGCP 69kv transmission line Nabas to Altavas tripped off.
1342023-04-29 @ 08:54:272023-04-29 @ 22:57:3014:03:031965PFUUnscheduled Outage. NGCP.
1352023-04-29 @ 02:40:492023-04-29 @ 08:35:1305:54:241959PFUUnscheduled Outage. NGCP.
1362023-04-29 @ 02:40:382023-04-29 @ 02:40:3800:00:001957PFUUnscheduled Outage. NGCP.
1372023-04-28 @ 14:56:502023-04-28 @ 23:08:5408:12:041950PFUUnscheduled Outage. NGCP.
1382023-04-27 @ 16:16:162023-04-27 @ 19:34:2103:18:051944PFUUnscheduled Outage. NGCP.
1392023-04-27 @ 13:51:002023-04-27 @ 15:58:4602:07:461937PFUUnscheduled Outage. NGCP. Island-wide Outage.
1402023-04-26 @ 20:16:092023-04-26 @ 20:35:2100:19:121930PFUUnscheduled Outage. NGCP.
1412023-04-26 @ 10:20:482023-04-26 @ 10:38:0200:17:141922PFUUnscheduled Outage. NGCP.
1422023-04-26 @ 05:48:082023-04-26 @ 09:39:3903:51:311914PFUUnscheduled Outage. Fallen tree at Dalipdip Brgy Hall.
1432023-04-25 @ 04:09:142023-04-25 @ 04:09:1500:00:011908PFUUnscheduled Outage.
1442023-04-24 @ 04:24:222023-04-24 @ 11:51:0107:26:391900PFUUnscheduled Outage. Failed cross-arm in Odiong.
1452023-04-23 @ 18:53:032023-04-23 @ 19:19:2400:26:211892PFUUnscheduled Outage. NGCP.
1462023-04-23 @ 03:07:412023-04-23 @ 17:03:2313:55:421884PFSScheduled Outage. NGCP Load Re-Distribution.
1472023-04-20 @ 19:32:182023-04-20 @ 20:19:4500:47:271874PFUUnscheduled Outage. NGCP Panit-an to Lezo 69kv.
1482023-04-20 @ 11:05:062023-04-20 @ 13:32:5602:27:501866PFUUnscheduled Outage. NGCP 69kV line failure.
1492023-04-17 @ 21:26:322023-04-17 @ 21:26:3300:00:011858PFUUnscheduled Outage.
1502023-04-16 @ 03:17:212023-04-16 @ 05:32:5402:15:331850PFSScheduled Outage. Transfer Altavas load from Nabas to Panitan.
1512023-04-13 @ 10:33:412023-04-13 @ 11:07:5000:34:091842PFUUnscheduled Outage.
1522023-04-12 @ 20:45:362023-04-12 @ 21:24:2700:38:511834PFUUnscheduled Outage.
1532023-04-12 @ 18:44:152023-04-12 @ 19:09:1900:25:041826PFUUnscheduled Outage.
1542023-04-05 @ 06:20:002023-04-05 @ 06:36:0000:16:001822PFUUnscheduled Outage. NGCP
1552023-04-03 @ 09:16:442023-04-03 @ 09:28:4900:12:051814PFUUnscheduled Outage.
1562023-04-01 @ 05:48:572023-04-01 @ 07:01:4701:12:501806PFUUnscheduled Outage.
1572023-04-01 @ 02:49:582023-04-01 @ 05:33:2602:43:281798PFUUnscheduled Outage.
1582023-03-25 @ 23:58:012023-03-25 @ 23:58:0300:00:021791PFUUnscheduled Outage.
1592023-03-25 @ 23:57:582023-03-25 @ 23:57:5800:00:001787PFUUnscheduled Outage.
1602023-03-16 @ 06:39:032023-03-16 @ 06:39:0400:00:011737PFUUnscheduled Outage.
1612023-03-13 @ 18:35:452023-03-13 @ 18:35:4600:00:011731PFUUnscheduled Outage.
1622023-03-11 @ 16:27:322023-03-11 @ 17:20:2200:52:501726PFSScheduled Outage. AKELCO connects the new Lezo substation to NGCP 69kV Line.
1632023-03-11 @ 05:02:282023-03-11 @ 05:44:0500:41:371720PFSScheduled Outage. AKELCO connects the new Lezo substation to NGCP 69kV Line.
1642023-02-26 @ 22:48:092023-02-26 @ 22:48:1000:00:011717PFUUnscheduled Outage.
1652023-02-20 @ 22:23:482023-02-20 @ 23:33:4901:10:011711PFUUnscheduled Outage. Part of 1700.
1662023-02-20 @ 22:23:462023-02-20 @ 22:23:4800:00:021709PFUUnscheduled Outage. Part of 1700.
1672023-02-20 @ 18:30:422023-02-20 @ 22:23:4603:53:041707PFUUnscheduled Outage. Part of 1700.
1682023-02-20 @ 18:30:382023-02-20 @ 18:30:4200:00:041705PFUUnscheduled Outage. Part of 1700.
1692023-02-20 @ 11:07:022023-02-20 @ 18:30:3807:23:361702PFUUnscheduled Outage. Panay-wide per NGCP.
1702023-02-20 @ 11:07:012023-02-20 @ 11:07:0200:00:011700PFUUnscheduled Outage.
1712023-02-19 @ 04:11:502023-02-19 @ 07:27:3203:15:421693PFSScheduled Outage. Altavas switched back to Nabas NGCP station.
1722023-02-05 @ 06:19:182023-02-05 @ 07:16:3900:57:211656PFSScheduled Outage. NGCP
1732023-02-02 @ 09:01:462023-02-02 @ 09:01:4700:00:011650PFUUnscheduled Outage.
1742023-01-26 @ 22:55:452023-01-26 @ 23:22:0600:26:211643PFUUnscheduled Outage. NGCP 69 KV tripped.
1752023-01-22 @ 18:57:322023-01-22 @ 18:57:3300:00:011575PFUUnscheduled Outage.
1762023-01-20 @ 11:04:182023-01-20 @ 14:02:5102:58:331566PFUUnscheduled Outage. Broken power pole crossarm.
1772023-01-19 @ 20:43:352023-01-19 @ 20:54:3100:10:561559PFUUnscheduled Outage. Appears to be wide-area.
1782023-01-15 @ 09:23:002023-01-15 @ 10:53:5601:30:561532PFUUnscheduled Outage.
1792023-01-14 @ 11:18:212023-01-14 @ 11:18:2200:00:011528PFUUnscheduled Outage.
1802023-01-12 @ 05:42:292023-01-12 @ 13:02:4007:20:111520PFUUnscheduled Outage. Replacement of cut-out assembly and insulators Balete to Altavas.
1812023-01-12 @ 04:08:372023-01-12 @ 05:01:4400:53:071512PFSScheduled Outage. Load balancing as Altavas feed reverts to Nabas.
1822023-01-10 @ 13:13:572023-01-10 @ 21:29:3208:15:351505PFUUnscheduled Outage. NGCP 69kV Line Issue.
1832023-01-08 @ 00:27:342023-01-08 @ 00:27:3400:00:001500PFUUnscheduled Outage.
1842023-01-05 @ 09:06:532023-01-05 @ 09:24:1000:17:171493PFUUnscheduled Outage.